Reservoir Simulation
Initializing models and predicting the reservoirs performances at different production scenarios to help in optimize the reservoir development and establishing the optimum reservoir management and optimum production strategy.
Modelling
QC of the Static model (QC of Sw, porosity, well survey, etc..)
Locating Reservoir engineering data such as PVT, SCAL and Pressure Datum to the model.
Building the reservoir dynamic model based on the static model.
Estimating the initial volumetric from G & G and the initialization of the dynamic model.
Matching the history data.
Generating the production profile for the different development alternatives such as do-nothing case,
Re-completion case and Infill case, etc...
Evaluating the need for pressure maintenance and EOR applications.
Establishing the Best Development Alternatives (BDA) to be used in the field optimization.
Conducting nodal analysis technique to study the impact of new development wells on the existing network.
Establishing the development alternatives to conclude the optimum well type and spacing ,
application of high technology wells like horizontal/multilateral for maximization of the recovery.
Deliverables:
Reservoir Engineering models
Production profile for BDA
PIIP estimates
Development philosophy
Optimum completion strategy
Optimum well spacing and pattern
Off-take rate and depletion strategy
Reports